上海地铁一号线人民广场振动测试与分析
DOI:
作者:
作者单位:

作者简介:

通讯作者:

基金项目:

国家自然科学基金(No.51178342);高等学校博士点基金(20130072110016)


Vibration Test and Analysis at the People’s Square of Shanghai,Metro Line 1
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    对上海地铁一号线人民广场站区间隧道进行振动测试,结合轨道加速度测试数据及车辆体系振动方程,建立地铁列车振动模拟荷载的数定表达式,并将荷载作用于FLAC3D数值模型上,分析地铁引起的地面振动响应。通过对比不同工况的数值分析结果,研究振动波在地表的传播规律,并讨论了隧道埋深对地面振动的影响,分析了不同频率的简谐地铁激励荷载引起的地面振动的衰减规律。

    Abstract:

    A field test was performed in the subway tunnel of metro Line 1 at Shanghai People’s Square Station. According to the data of the track acceleration test and the equation of the vehicle system vibration,a simulated deterministic expression of the metro load was obtained.The ground vibration due to the moving metro was simulated by applying the load to an FLAC3D numerical model. Through comparison of the numerical analysis results of different working conditions, the wave propagation, and attenuation at the ground surface, the dependence of the ground vibration on the tunnel depth and the frequency of the simple harmonic excitation load are analyzed.

    参考文献
    相似文献
    引证文献
引用本文

高广运,朱林圆,李卫华,林健.上海地铁一号线人民广场振动测试与分析[J].地震工程学报,2014,36(1):429-433. GAO Guang-yun, ZHU Lin-yuan,LI Wei-hua, LIN Jian. Vibration Test and Analysis at the People’s Square of Shanghai,Metro Line 1[J]. China Earthquake Engineering Journal,2014,36(1):429-433.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-05-06