Based on the coupling relation between bulk dilatation ratio and water level variation,the water level variation of Baoshan well is simulated by using finite differential method.The original water level data is sampled during the preparation and occurrence of the Menglian MS7.3 earthquake on July 12,1995 and Lijiang MS7.0 earthquake on Feb.3,1996.The variations of the average stress rate near the well are obtained by fitting the simulated curves with practical measurement curves.
参考文献
相似文献
引证文献
引用本文
尹京苑,赵利飞.保山井水位异常的数值模拟[J].地震工程学报,2000,22(4):397-401. YIN Jing-yuan, ZHAO Li-fei. NUMERICAL SIMULATION OF WATER LEVEL ANOMALY OF BAOSHAN WELL[J]. China Earthquake Engineering Journal,2000,22(4):397-401.